Clear car history - VIN: WBS83CH05NCK23035

2022 BMW M5
VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
  • 2022 BMW M5 VIN: WBS83CH05NCK23035
Sale information
  • Sale price 21 300 USD
  • Auction IAAI
  • Lot number 41216785
  • Sale location Fremont
  • Sale date 2025-03-03
  • Retail value 84840$
  • Repair cost $
Specs
  • Color
  • Drive All-Wheel Drive
  • Fuel Other
  • Engine 4.4L V-8 Di, Dohc, Vvt, Turbo, 600Hp
Condition
  • Title Bmw M5 2022
  • Runs and Drive Stationary
  • Odometer 29681 mi
  • Keys Yes
  • Primary damage Front End
  • Secondary damage Left & Right Side
About lot

Car 2022 BMW M5 VIN number WBS83CH05NCK23035. This vehicle was sold at IAAI auto auction lot number 41216785, auction date 2025-03-03.

The vehicle has an engine size of 4.4L V-8 Di, Dohc, Vvt, Turbo, 600Hp and a mileage of 29681 MI. Our service provided the following details for the lot: Front End damage, Stationary condition of the car.

If you are the owner of this vehicle and want to delete the car's history from the Internet, leave a request for deletion and our manager will contact you as soon as possible.

Similar vehicles
New VINs
Leave a request and we will protect the privacy of your car
Leave a request for deletion