Clear car history - VIN: WBS43AZ03PCM25277

2023 BMW M4 COMPETITION XDRIVE
VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
  • 2023 BMW M4 COMPETITION XDRIVE VIN: WBS43AZ03PCM25277
Sale information
  • Sale price 44 500 USD
  • Auction IAAI
  • Lot number 36262987
  • Sale location Newburgh
  • Sale date 2023-05-12
  • Retail value 92590$
  • Repair cost 38751$
Specs
  • Color Gray
  • Drive All Wheel Drive
  • Fuel Gasoline
  • Engine 3.0 L 6 Cyl
Condition
  • Title Bmw M4 Competition Xdrive 2023
  • Runs and Drive Run And Drive
  • Odometer 1712 mi Actual
  • Keys
  • Primary damage Front End
  • Secondary damage Right Rear
About lot

Car 2023 BMW M4 COMPETITION XDRIVE VIN number WBS43AZ03PCM25277. This vehicle was sold at IAAI auto auction lot number 36262987, auction date 2023-05-12.

The vehicle has an engine size of 3.0 L 6 Cyl and a mileage of 1712 MI. Our service provided the following details for the lot: Front End damage, Run And Drive condition of the car.

If you are the owner of this vehicle and want to delete the car's history from the Internet, leave a request for deletion and our manager will contact you as soon as possible.

Similar vehicles
New VINs
Leave a request and we will protect the privacy of your car
Leave a request for deletion