Clear car history - VIN: WBS43AY07PFN72086
- Sale price 33 750 USD
- Auction IAAI
- Lot number 42216927
- Sale location North Hollywood
- Sale date 2025-06-25
- Retail value $
- Repair cost $
- Color Black
- Drive All-Wheel Drive
- Fuel Gasoline
- Engine 3.0L
- Title Bmw M3 Competition Xdrive 2023
- Runs and Drive Stationary
- Odometer 35743 mi
- Keys Key Available
- Primary damage Front & Rear
- Secondary damage
Car 2023 BMW M3 COMPETITION XDRIVE VIN number WBS43AY07PFN72086. This vehicle was sold at IAAI auto auction lot number 42216927, auction date 2025-06-25.
The vehicle has an engine size of 3.0L and a mileage of 35743 MI. Our service provided the following details for the lot: Front & Rear damage, Stationary condition of the car.
If you are the owner of this vehicle and want to delete the car's history from the Internet, leave a request for deletion and our manager will contact you as soon as possible.