Clear car history - VIN: WBS3R9C57GK336041

2016 BMW M4
VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
  • 2016 BMW M4 VIN: WBS3R9C57GK336041
Sale information
  • Sale price 12 550 USD
  • Auction IAAI
  • Lot number 42947600
  • Sale location Detroit
  • Sale date 2025-10-10
  • Retail value $
  • Repair cost $
Specs
  • Color White
  • Drive Rear Wheel Drive
  • Fuel Gasoline
  • Engine 3.0L I-6 Di, Dohc, Vvt, Turbo, 425Hp
Condition
  • Title Bmw M4 2016
  • Runs and Drive Run & Drive
  • Odometer 139772 mi
  • Keys Yes
  • Primary damage Front End
  • Secondary damage Side
About lot

Car 2016 BMW M4 VIN number WBS3R9C57GK336041. This vehicle was sold at IAAI auto auction lot number 42947600, auction date 2025-10-10.

The vehicle has an engine size of 3.0L I-6 Di, Dohc, Vvt, Turbo, 425Hp and a mileage of 139772 MI. Our service provided the following details for the lot: Front End damage, Run & Drive condition of the car.

If you are the owner of this vehicle and want to delete the car's history from the Internet, leave a request for deletion and our manager will contact you as soon as possible.

Similar vehicles
New VINs
Leave a request and we will protect the privacy of your car
Leave a request for deletion