Clear car history - VIN: WBS33HJ05SFT74162
- Sale price 69 000 USD
- Auction IAAI
- Lot number 41609207
- Sale location Long Island
- Sale date 2025-02-25
- Retail value 104329$
- Repair cost $
- Color Blue
- Drive All-Wheel Drive
- Fuel Gasoline
- Engine 3.0L I-6 Di, Dohc, Vvt, Turbo, 523Hp
- Title Bmw M3 2025
- Runs and Drive Run & Drive
- Odometer 2912 mi
- Keys Yes
- Primary damage Front End
- Secondary damage
Car 2025 BMW M3 VIN number WBS33HJ05SFT74162. This vehicle was sold at IAAI auto auction lot number 41609207, auction date 2025-02-25.
The vehicle has an engine size of 3.0L I-6 Di, Dohc, Vvt, Turbo, 523Hp and a mileage of 2912 MI. Our service provided the following details for the lot: Front End damage, Run & Drive condition of the car.
If you are the owner of this vehicle and want to delete the car's history from the Internet, leave a request for deletion and our manager will contact you as soon as possible.