Clear car history - VIN: 5RXTD1921C1023049

2012 SHADOW CRUISER S-195WBS
VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
  • 2012 SHADOW CRUISER S-195WBS VIN: 5RXTD1921C1023049
Sale information
  • Sale price 0 USD
  • Auction IAAI
  • Lot number 44027032
  • Sale location billings
  • Sale date 2026-04-15
  • Retail value $
  • Repair cost $
Specs
  • Color White
  • Drive
  • Fuel Other
  • Engine
Condition
  • Title Shadow Cruiser S-195Wbs 2012
  • Runs and Drive Stationary
  • Odometer mi Not Required/Exempt
  • Keys Key Available
  • Primary damage Left Side
  • Secondary damage
About lot

Car 2012 SHADOW CRUISER S-195WBS VIN number 5RXTD1921C1023049. This vehicle was sold at IAAI auto auction lot number 44027032, auction date 2026-04-15.

The vehicle has an engine size of and a mileage of MI. Our service provided the following details for the lot: Left Side damage, Stationary condition of the car.

If you are the owner of this vehicle and want to delete the car's history from the Internet, leave a request for deletion and our manager will contact you as soon as possible.

Similar vehicles
New VINs
Leave a request and we will protect the privacy of your car
Leave a request for deletion